Hydro-Québec/Import/Bornes du Circuit électrique
UNOFFICIAL - Work In Progress
Circuit électrique chargers is an import of Hydro-Québec's [1] dataset.
Goals
The goal is to import nodes for the above feature in cases where they are missing in the existing OSM data for the territory of Québec. This import will also conflate the tag information for existing chargers with the data that will be obtained via the process described below. The processing is to be reccurrent, as new chargers are installed and activated over time. There shall be no charger overlap (with other dataset like [Montréal/Imports/Bornes_de_recharge_publiques_pour_voitures_électriquesBornes_de_recharge_publiques_pour_voitures_électriques]). At time of writing initial version, this amounts to 6 148 charger additions or modifications, with expected minimal ovelap of 767 charger in Montréal area.
Import Data
Background
Data source sites: [2]
Data license: [3].
Type of license: CC-BY-4.0.
Link to permission: Hydro-Québec/Imports/Circuit électrique to do.
OSM attribution: Contributors ("Hydro-Québec" to be added).
ODbL Compliance verified: not yet.
Import Type
This is a recurring import that will be added to the OSM database via a method to be defined.
Data Preparation
Tagging Plans
To be specified.
Changeset Tags
To be specified.
Data Transformation
Step by step instructions
To be specified.
Data Merge Workflow
Workflow
Step by step instructions
Changeset size policy
To be specified.
Revert plans
If ever something goes wrong, the adequate Reverter plugin will be used.
Conflation
To be specified.