Ireland/Roads/Motorways
Jump to navigation
Jump to search
Motorways
This table can be updated periodically to show the status and progress in mapping the Irish motorway network. CheckAutopista may be used to check
Progress Summary
Colour and symbol legend
The status of the motorways is indicated by a symbol, which describes the type of feature, and a colour, which indicates the completeness of that feature
Meaning of symbols
- - The Motorway is completly mapped.(highway=motorway) - Key: c
- - All Exits are present.(highway=motorway_link) - Key: ex
- - All Motorway Service Utilities are present (Parking with -WC, motorway service area,...). - Key: se
- - All Exit Names and Exit numbers mapped .(highway=motorway_junction, ref=* and name=* on the exit node) - Key: ju
- - All Lane information complete (lanes=*). - Key: ln
- - Speed limitations tagged. (maxspeed=*) - Key: sp
- - Traffic Message Channel information tagged. (TMC=*) - Key: tm
- - The Motorway is linked to a Relation . (Relation type=route) - Key: rl
Meaning of colours
This table is a wiki template with a default description in English. Editable here.
Progress Detail
Guidance on updating the progress tables:
- Name If your motorway isn't listed, add a new row for it.
- Carriageways In the carriageways columns enter a rough estimate of the percentage complete for each carriageway. (Some motorways may have been drawn initially as a single carriageway in which case enter 100% in column 1 and 0% in column 2).
- Junctions - Total Enter a rough count of the number of junctions. Taking the highest junction number is a good enough approximation.
- Junctions - Count Enter a count of the number of junctions that have been mapped.
- Last Update Each time you update the table replace the contents of this column with ~~~~ which will automatically insert your user name and a date/time stamp.
- Notes Enter notes about progress, pleas for help, etc.
Carriageways | Junctions | |||||||
---|---|---|---|---|---|---|---|---|
Name | 1 | 2 | Total | Complete | Last Update | Notes | Relation | status |
M1 Dublin - Dundalk | 100% | 100% | 20 | 20 | Teester (talk) 13:04, 7 November 2015 (UTC)) | 5644570 5644570 | ||
M2 Kilshane - Ashbourne | 100% | 100% | 3 | 3 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644573 5644573 | ||
M3 Clonee - Kells | 100% | 100% | 6 | 6 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644575 5644575 | ||
M4 Lucan - Mullingar | 100% | 100% | 9 | 9 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644576 5644576 | ||
M6 Kinnegad - Galway | 100% | 100% | 14 | 14 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644578 5644578 | ||
M7 Naas - Limerick | 100% | 100% | 21 | 21 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644579 5644579 | ||
M8 Portlaoise - Cork | 100% | 100% | 18 | 18 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644580 5644580 | ||
M9 Newbridge - Waterford | 100% | 100% | 12 | 12 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644581 5644581 | ||
M11 Shankill - Bray, Ashford - Gorey | 100% | 100% | 12 | 12 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644571 5644571 | ||
M18 Shannon - Gort | 100% | 100% | 8 | 8 | Teester (talk) 13:04, 7 November 2015 (UTC) | Complete to the point of the current build status | 5644572 5644572 | |
M20 Limerick - Patrickswell | 100% | 100% | 5 | 5 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644574 5644574 | ||
M50 Dublin ring-road | 100% | 100% | 16 | 16 | Teester (talk) 13:04, 7 November 2015 (UTC) | 5644577 5644577 |