Kyoto City Bus GTFS Data Import
Kyoto City Bus GTFS Data Import is an import of GTFS data of Kyoto City Bus. The import is currently (as of 2024-02-05) at the planning stage.
Kyoto City Bus GTFS Data Importは京都市営バスのGTFSデータをインポートするプロジェクトであり、2024-02-05時点では計画中のものです。
Goals
Import GTFS data for Kyoto City bus stops and bus routes. This will improve data accuracy, including correcting the location of existing bus stops.
京都市バスのバス停とバスの経路の情報をインポートします。これによって、既存バス停の位置修正を始めとしたデータ正確性の向上を図ります。
Schedule
List the general timeframe of your project.
Import Data
Background
Provide links to your sources.
Data source site: https://ckan.odpt.org/dataset/kyoto_municipal_transportation_kyoto_city_bus_gtfs
Data license: https://developer.odpt.org/terms
Type of license (if applicable): CC0 (Public Domain)
ODbL Compliance verified: yes
OSM Data Files
Provide a link to the data files you have prepared for import.
Import Type
Identify if this is a one-time or recurring import and whether you'll be doing it with automated scripts, etc.
Identify what method will be used for entering the imported data into the OSM database - e.g. API, JOSM, MapRoulette, etc.
Data Preparation
Data Reduction & Simplification
Describe your plans, if any, to reduce the amount of data you'll need to import.
Examples of this include removing information that is already contained in OSM or simplifying shapefiles.
Tagging Plans
Describe your plan for mapping source attributes to OSM tags.
Changeset Tags
Fill in the values your changesets will use.
Key | Value |
---|---|
comment | |
import | yes |
source | name of the source dataset |
source:url | dataset link |
source:date | age of dataset at time of import, if known. |
import:page | link to this wiki page |
source:license | license of source dataset, using this format. |
Data Transformation
Describe the transformations you'll need to conduct, the tools you're using, and any specific configurations or code that will be used in the transformation.
Data Transformation Results
Post a link to your OSM XML files.
Data Merge Workflow
Team Approach
Describe if you'll be doing this solo or as a team.
References
List all factors that will be evaluated in the import.
Workflow
Detail the steps you'll take during the actual import.
Information to include:
- Step by step instructions
- Changeset size policy
- Revert plans
Conflation
Identify your approach to conflation here.
QA
Add your QA plan here.
See also
The post to the community forum was sent on YYYY-MM-DD and can be found here