Proposal:Under Construction
Jump to navigation
Jump to search
There is a better way: use highway=construction
Key:construction describes how to use it.
Original proposal
Under_Construction | |
---|---|
Proposal status: | Abandoned (inactive) |
Proposed by: | Marki |
Tagging: | highway=Under_Construction |
Applies to: | linear |
Definition: | a highway under construction |
Statistics: |
|
Rendered as: | Broken Line, grey colour |
Draft started: | |
Proposed on: | 2007-12-22 |
Description
I cannot find any tags to use for a road or highway that is under-construction or proposed. If not otherwise already provided for, two alternatives are possible.
1. An under-construction value for the highway tag. Should also have an tag 'completion', to refer to completion date.
2. A tag as per other highways (eg 'trunk road' etc.) with another tag status=under-construction (or under-construction=yes) and then another completion date tag.
A similar tag is proposed for a Proposed Highway
--Marki 18:08, 21 December 2007 (UTC)
- This is a duplicate page - original page at Proposed_features/Road/Rail_under_construction
- This already renders on Osmarender however, rendering is <k=highway, v=construction><k=construction, v=[highway type]>Richard B 21:15, 21 December 2007 (UTC)
Tags
Applies to highways:
<tag k="highway" v="Under_Construction"/> <tag k="name" v="Tugun Bypass"/> <tag k="completion" v="08 June 2008"/>
Example
- Tugun Bypass (Australia), due for completion 08 June 2008.
- Tunnel in Stockholm, Sweden
Comments
Please use the discussion page for comments.
Proposal
The tag described above.